1.2

Superbolt Product: Confirm jackbolts are lubricated with correct Superbolt lubricant (JL-G, JL-M or JL-AS). New product is lubricated at the factory. Make sure the jackbolt tips are even (or recessed) with the bottom of the nut body.

Torque Wrenches: Based on your target torque (which is provided with your order) select the appropriate hand tools.

Sockets: High hex stresses require the use of quality six-point impact sockets. Have several spares handy for each job and replace them at the first sign of wear. Special Superbolt sockets may be required when using a 3/4” impact or torque wrench and jackbolt spacing is close.

Target Torque Data: Determine the target jackbolt torque supplied with your order.

Note: The jackbolt torque stamped on the tensioner is a standard value for that part and may not be correct for your application. If you are unsure, contact Superbolt.

 

 

Air Impacts: If using air impacts, select a tool with an output of about 100% - 120% of the target torque. See “Air Impact Tool Selection”.

Lubricants: Jackbolts are pre-lubricated from the factory with the correct Superbolt lubricant. For the main stud, any standard anti-seize lubricant can be used.

Note: For reuse, the jackbolts should be removed, cleaned and re-lubricated with the correct Superbolt lubricant.

Washers: Apply the correct Superbolt lubricant to the washer face.

For flanges: To speed up installation, use two workers at 180º apart, following OEM pattern for tightening.

1

Step 1: Lubricate the thread of the main stud and slide the hardened washer onto the stud. Spin the tensioner onto the thread until it seats against the washer. Then back the tensioner off to provide a small gap between the nut body and the washer.

2

Step 2: Tighten (4) jackbolts at 90º apart on all studs with a partial torque of approximately 50% (this serves to seat the flange). If using an air impact, use a reduced setting or lightly pulse the trigger.

3

Step 3: At 100% target torque, tighten the same (4) jackbolts on all studs.

4

Step 4: At 100% target torque, tighten all jackbolts in a circular pattern. Do this procedure for all studs (1 round only). See Helpful Tip #6.

 

 

5

Step 5: Repeat “Step 4” until all jackbolts are stabilized (less than 20º rotation). This usually requires 2-4 additional passes. If using air tools, switch to a torque wrench when socket rotation is small. Use the torque wrench to stabilize at the target torque.

Note: Product with 4 or 6 jackbolts – use a star pattern for all steps.

Note: Prior to reuse, remove, clean and relubricate the jackbolts with the correct Superbolt lubricant. The washer may also be reused. Small depressions on the washer are normal.

Step 1: Loosen each jackbolt 1/8 turn following a circular pattern around the tensioner (1 round only). As you move around and get back to the first jackbolt, it will be tight again. Do this for all studs on the joint prior to the next step.

Step 2: Repeat a 2nd round as above for all studs, now loosening each jackbolt 1/4 turn in a circular pattern.

Step 3: Continue loosening 1/4 turn for 3rd and successive rounds until all jackbolts are loose, then remove the tensioner.

Note: Usually after the 3rd or 4th round, an air impact can be used to completely extract the jackbolts, one by one. For long bolts or tie rods, additional rounds may be required before removing the jackbolts with an impact tool.

Note: Heating rods can be used to reduce the removal torque required.

Step 1: As the equipment is cooling down (around 300ºF), apply penetrating oil to the jackbolts and washer and let sit for several hours. Thoroughly “wet-down” all components and re-apply during equipment cool-down period. If the tensioner is inverted, squirt oil in the gap between the nut body and the washer. Synthetic oil can be used for oiling above 300ºF.

Step 2: Wait for tensioners to cool below 200ºF. Using a circular pattern, "crack” each jackbolt only enough to ensure movement. Do not turn beyond the break-loose point. Do this for all studs.

Step 3: Now begin with “Step 1” of the procedure for service under 250ºF.